OUR MAJOR PROJECTS HANDLED:

1) East West pipe line of Reliance gas transmission & infrastructure limited Compression Stations 1, 2,3,4,5
2) LPG gas loading & unloading facilities at BPCL Cherlapally, Hyderabad.
3) Storage tanks at IOCL Cherlapally, Hyderabad.
4) Refinery piping at IOCL BARAUNI, Patna.
4) 500 MW Thermal power plant (VTPS) at Vijay Wada, A.P.
5) 500 MW Thermal power plant (KTPS) at Warangal, A.P.
6) Storage tanks at SKOL Beverages limited. Sangareddy A.P.
7) 250, 500MW power plant shut down at NTPC, Ramagundam A.P.
8) Cooling Water pipe line at NTPC Sipat, Chattisgarh.
9) Delhi Metro water pipe line.
10) 210MW Power plant at cuddapah A.P.
13) 48", 24" Line pipes at Welspun Gujarat.
14) Valve body castings (Virgo valves), at Rajkot, Gujarat.
15) Cement Plant equipments, heat exchangers, pressure vessels at kitti steels limited, Hyderabad.
16) 16", 14" gas transmission lines at HPCL Hyderabad.
17) Cooling water pipeline dia 3000mm at MAHAGENCO Bhusawal.
18) A.P. Genco, Hydro power project, Srisailum.
19) Davadula Water Project, Phase 1 & 2.
20) Storage tanks at U B Beverages limited. Sangareddy A.P.
21) Punjilloyd's Ltd, IOCL Refinary, Baruni, Bihar.
22) Pre Heating & Stress Realiving work of Header repair work in unit – 2, at 2x660 MW Solapur Super thermal Power Project , Solapur, Maharashtra State.